Dry Riser Servicing, Testing And Inspection
Standard
Specification For Dry Riser Systems 5306 Part 1.
- Inspect
entire system, check operation of landing valves, and instantaneous
couplings.
- Check
that sealing washers, caps and chain straps and padlocks are intact.
- If cabinet
mounted, check operation of locks and hinges.
- Remove
and clean air exhauster.
- Clean
and check seals in inlet breeching points.
- Clean
and check seals on inlet breeching points. Lubricate breeching box hinges
and lock.
- Issue
report
Once
Annually.
- In addition
to the above remove and plug air exhauster, charge entire system with
water and pressure to 10 bars.
- Leave
on test for a minimum of fifteen minutes and inspect visually for leaks.
- Upon
completion de-pressurise system and drain, refit air exhauster.
- Issue
hydraulic test certificate
|